Entergy Leads in Brand Trust among Utilities
Commitment to community, low-income customers cited
This author has not written his bio yet.
But we are proud to say that Nicole Bradshaw contributed 18 entries already.
Commitment to community, low-income customers cited
June 1-7 is National CPR and AED Awareness Week
When Dub Barfield needed a roof on his camp house, he climbed up a ladder and nailed it on himself. He enlisted his family to help. As he reached the end of a long row of shingles, one of his nails went in crooked.
Annual mind meld leads to valuable grid research
Employee development, leadership opportunities recognized second year in a row
Fiber prototypes offer cost, safety and speed advantagesIn early 2014, a small team of Entergy engineers began an ambitious project — create a real-world pilot that would test the use of fiber optic cable instead of copper in the company’s substations. “Our project goal was to make new, disparate devices and systems work together,” said Dr. Chan Wong, a senior engineer. “We wanted to learn more about this technology, some of it in prototype stage, and test its functionality on our system. And we wanted hard data on how new fiber technology could benefit our customers.” Fiber’s potential advantages are persuasive. Fiber is leaner than copper and is energized at a lower voltage level. This leads to neater facilities and reduced safety risks. After a severe weather event, it’s quicker to restore fiber, which lies in buried channels in a substation. In comparison to copper, fiber can be designed and installed for about half the cost. Lastly, fiber is less likely than copper to be stolen due to its lower resale value. To find out more, the team created a multivendor equipment lab. The lab has served as an open testing platform for Entergy and potential vendors to integrate equipment and systems in a centralized location. For more than a year, team members used the lab to evaluate and learn about new software, hardware and processes. In August, the team began a field pilot at the Joliet substation in New Orleans, Louisiana, installing several test panels and tracking their performance. The pilot represents one of the first installed multivendor systems compliant with theInternational Electrotechnical Commission’s 61850 industry standard. It also supports Entergy’s strategy of making productive investments in its business, central to both its utility and transmission business plans. Through the pilot, the team has realized many of the advantages of fiber optic cable installation in substations. The pilot shows reduced substation construction materials, a shorter and easier commissioning and testing process in the field and quicker recovery when breaker cabinets are flooded. In addition, equipment and device testing have been easier, automated without the need for test leads changes. System debugging has also been simplified, and any alarms within the system are easy to analyze.
Class celebrates, prepares for a new chapter
It was a warm spring night in West Monroe, Louisiana. Entergy employee Ronnie Sanderson and his son, Tyler, were getting ready for some father-son time. They’d registered to participate in a fishing tournament, set to begin the following morning.